Dashboard
Machine A-101
CriticalHealth
45%Temperature
89°CVibration
HighEstimated failure: 2 daysHours: 2,450
Machine B-202
WarningHealth
72%Temperature
65°CVibration
MediumMaintenance due: 5 daysHours: 1,890
Machine C-303
RunningHealth
95%Temperature
42°CVibration
LowNext maintenance: 30 daysHours: 980
Machine D-404
OfflineHealth
--Temperature
--Vibration
--Scheduled maintenanceHours: 3,240
Machine A-101
ID: MA101-2024
Real-time Performance
Temperature
89°C↑ 5°C
Above normal range
Vibration
HighCritical
Exceeds threshold
Component Health
Bearings
45%
Motor
78%
Cooling System
92%
Maintenance Timeline
Bearing Replacement Required
Due in 2 days
Critical Priority
Last Maintenance
Oil Change
14 days ago
Predictive Warnings
Critical Warning
Bearing failure predicted within 48 hours
Affected Components:
- Main bearing assembly
- Drive shaft coupling
Analytics
Failure Probability
High RiskBearing Failure
75%
Motor Overheating
45%
Root cause: Excessive vibration patterns indicate bearing wear
Maintenance Optimization
Recommended Maintenance Window
Tomorrow, 8:00 AM - 11:00 AM
Required Parts
- Bearing Assembly #2234In Stock
- Lubricant Type AOrder Required
Resource Requirements
- • Senior Technician (3 hours)
- • Assistant Technician (2 hours)
Cost Impact Analysis
Preventive$2,500Recommended
Reactive$12,000Potential Cost
ROI on Preventive Maintenance380%
Performance Benchmarking
Efficiency vs. Similar Units85%
Maintenance Frequency+15%
This unit requires 15% more maintenance compared to similar equipment
Settings
Alert Preferences
Push Notifications
Email Notifications
Equipment Management
Sensor Calibration
Maintenance Schedule
Data Settings
App Settings
Dark Mode
About
Version2.1.0